What to Settle Before an AI Project Starts

Many AI projects stall on questions left open at the start. The 3 things to settle first are the job, the owner and the records, and why each one matters.

Praxis Consulting Company4 min read
A precise grid of white facade panels: an illustrative image for structured data and systematic design.

This is for a leader who has decided to try AI on some part of the business and wants to avoid the pattern where the project is announced, started, and then quietly stops. In most of those cases, the cause was not the technology. It was a question that was open on day one and stayed open. Three of them account for most stalled projects: which job, who owns it, and what records it will run on. Each is cheap to settle before work begins and expensive to settle after.

What is the first thing to settle: which job?

Pick one job, and state it in a sentence a colleague would recognise. "Improve customer service" is a direction. "Draft first replies to the enquiries that arrive in the shared inbox" is a job. The test is whether two people asked separately would describe the same thing.

Then attach one measure to it: how long a case takes now, how many are handled in a week, how often one comes back for correction. The number can be rough, but it has to exist before anything changes, because the result will be read against it.

Resist the pull to include a second job. A project with two goals is read against neither. If a second job matters, it is a second project, and it will be better chosen after the first has produced a result.

What is the second: who owns it?

Every AI tool that works needs a person who answers for it afterwards. That person checks the output, handles the cases the tool passes back, notices when something drifts and decides when to change a rule. If the answer to "who owns it" is "the vendor" or "IT, presumably", the project has no owner and will decay.

Ownership has 3 parts worth naming explicitly.

  • The person who owns the result. Usually the manager of the team whose job it is, not a technical role.
  • The person who handles exceptions. The tool will pass back the cases it cannot decide, and someone has to be there to receive them.
  • The person with authority to say stop. If the tool produces something wrong, a named person can pause it without a meeting.

Ownership also has to be given time. A role that is added to a full week gets done last.

What is the third: which records will it run on?

AI tools read records: emails, documents, spreadsheets, tickets, forms. Three questions about those records are worth answering before a build, because they decide whether the project is a few days of setup or a long detour.

  • Can the tool get at them? Some records live in systems that are hard to connect to, or in formats that need conversion first.
  • Are they in usable shape? A set of past cases with missing fields and inconsistent names is workable for some jobs and hopeless for others. A short look at 20 real cases will tell you which.
  • Is the business allowed to use them this way? Customer records, employee records and anything covered by a contract may carry limits on what can be done with them. Find those limits before the build, not after.

What does it look like when these are settled?

A half-page that states the job in a sentence, the measure and its current value, the three owners by name, and the records the tool will read, with a note on their condition. That page is also the brief for whoever builds the work, which is why it is worth writing even when the build is done in-house. What follows that page, in order, is described in what the phases of an AI project look like.

If any line cannot be filled in, that is the finding. A missing owner or an unreachable record is much cheaper to learn about on paper than in week three of a project.

Where this fits

The half-page is the heart of an AI readiness review for business: a short written assessment of which jobs AI could take over, which it should not, and what the first project would be. A business that would like to get a first sense on its own can try the AI readiness scorecard, and the free consultation is a conversation about the job and the records, held remotely. If the project is already underway and slowing down, why employees do not use the AI tools you bought covers the adoption side. Where the half-page points to more than one job, choosing the order they go in is part of planning AI work across the whole business.

When the 3 items are settled and the next step is a quote, request a free quote.

Filed underAI readinessAI implementationproject planningsmall business

Written in the firm’s voice by Praxis Consulting Company. We publish frameworks we actually use, never fabricated results, client names, or guarantees. See about the firm.